Toggle navigation
|
Inbox
View Profile
Log Out
FM.MT.05.01
SURAT PERINTAH KERJA ( WORK ORDER )
WORKORDERNO
WORKCENTER
PRIORITY
TGLDIKERJAKAN
DURASIPEKERJAAN
EQUIPNO
JUMLAHORANG
EQUIPDESC
DESKRIPSI KERJA
1 Check, Cleaning, and Verify HSV Tension Reel Drum Spreading Spread 2 Check, Cleaning, and Verify HSV Tension Reel Drum Spreading Collapse 3 Check, Cleaning Tension Reel Drum Spreading position pressure 4 PM Cleaning, Verifikasi Sensor Proximity Tension Reel Lubrication Flow Indicator 5 Check Connection and Tightening Terminal Box Tension Reel 6 Check, Cleaning Tension Reel Lubrication Pressure Switch 7 PM cleaning Recoiler Local Panel LOP 20 8 PM Cleaning, Verifikasi Sensor Proximity switch LUB; Flow Normal, Filterblock, Preassure Switch, Manual Valve Open 9 PM Cleaning, Verifikasi Sensor Proximity switch Tension Reel hold down roll open position
MATERIAL
TOOLS
PROCEDURE :
1 Check, Cleaning, and Verify HSV Tension Reel Drum Spreading Spread 2 Check, Cleaning, and Verify HSV Tension Reel Drum Spreading Collapse 3 Check, Cleaning Tension Reel Drum Spreading position pressure 4 PM Cleaning, Verifikasi Sensor Proximity Tension Reel Lubrication Flow Indicator 5 Check Connection and Tightening Terminal Box Tension Reel 6 Check, Cleaning Tension Reel Lubrication Pressure Switch 7 PM cleaning Recoiler Local Panel LOP 20 8 PM Cleaning, Verifikasi Sensor Proximity switch LUB; Flow Normal, Filterblock, Preassure Switch, Manual Valve Open 9 PM Cleaning, Verifikasi Sensor Proximity switch Tension Reel hold down roll open position
TglMulai
TglSelesai
TotalJam
Status
NamaPekerja1
NamaPekerja3
NamaPekerja2
NamaPekerja4
Comment :
Download
Back to List