FM.MT.05.01
SURAT PERINTAH KERJA ( WORK ORDER )
WORKORDERNO
WORKCENTER
PRIORITY
TGLDIKERJAKAN
DURASIPEKERJAAN
EQUIPNO
JUMLAHORANG
EQUIPDESC
DESKRIPSI KERJA
MODIFIKASI PIPING DEMIN (DRAIN DEMIN WATER)
MATERIAL
TOOLS
Checv Valve 11/2" = 4 pcs, Gasket Flange PN 16 = 8 pcs
Kunci set, Las Argon , Scafolding, Gerinda Tangan
PROCEDURE :
Langkah Safety : 1. Permit Hot work 2. JSA 3. Pasang Scafolding 4. Drain water demin Langkah Kerja : 1. Matikan sumber Listrik Pompa demin Isolation Prosedur 2. Release/Drain Air demin sampai habis 3. Marking terlebih dahulu piping yang mau di potong 4. Potong piping sesuai ukuran checkvalve 5. Las Flange PN.16 6. Pasang Check valve 11/2" PN 16 set gasket 7. comisioning : Test kebocoran, Test Pressure 8. Start Auto kembali
TglMulai
TglSelesai
TotalJam
Status
NamaPekerja1
NamaPekerja3
NamaPekerja2
NamaPekerja4
Comment :
sudah di test comisioining tidak ada kebocoran