FM.MT.05.01
SURAT PERINTAH KERJA ( WORK ORDER )
WORKORDERNO
WORKCENTER
PRIORITY
TGLDIKERJAKAN
DURASIPEKERJAAN
EQUIPNO
JUMLAHORANG
EQUIPDESC
DESKRIPSI KERJA
1).Check and Verify Solenoid Valve Hydraulic POR1 2).PM Capacitive Sensor & Tranducer CPC #1 3).Check, Tightening, Cleaning Junction Box & Local Panel CPC #1 4)Preventive Cleaning No.1 Uncoiler Local Panel (LOP 1)
MATERIAL
TOOLS
PROCEDURE :
1) PM Cleaning, Verifikasi Sensor Magnetic Switch No.1 Pay-off Reel Snubber Roll Close/Open Detect 2) PM Cleaning, Verifikasi Sensor Proximity No.1 Pay-off Reel Drum Shink / Expand Position Detect 3) PM Cleaning, Verifikasi Sensor Proximity No.1 Pay-off Reel - Hold Roll Open Detect- 0 Stroke Position- Center Stroke Position 4).Check and Verify Solenoid Valve Hydraulic POR1 5).PM Capacitive Sensor & Tranducer CPC POR #1 6)Preventive Cleaning No.1 Uncoiler Local Panel (LOP 1)
TglMulai
TglSelesai
TotalJam
Status
NamaPekerja1
NamaPekerja3
NamaPekerja2
NamaPekerja4
Comment :
1) PM Cleaning, Verifikasi Sensor Magnetic Switch No.1 Pay-off Reel Snubber Roll Close/Open Detect (DONE) 2) PM Cleaning, Verifikasi Sensor Proximity No.1 Pay-off Reel Drum Shink / Expand Position Detect (DONE) 3) PM Cleaning, Verifikasi Sensor Proximity No.1 Pay-off Reel - Hold Roll Open Detect- 0 Stroke Position- Center Stroke Position (DONE) 4).Check and Verify Solenoid Valve Hydraulic POR1 5).PM Tranducer CPC POR #1 (DONE) 6)Preventive Cleaning No.1 Uncoiler Local Panel (LOP 1) (DONE)