FM.MT.05.01
SURAT PERINTAH KERJA ( WORK ORDER )
WORKORDERNO
WORKCENTER
PRIORITY
TGLDIKERJAKAN
DURASIPEKERJAAN
EQUIPNO
JUMLAHORANG
EQUIPDESC
DESKRIPSI KERJA
PM cleaning Sensor sensor, Solenoid Valve Hydraulic POR 2 dan Tightening Local Panel (LOP 2)
MATERIAL
TOOLS
PROCEDURE :
1) PM Cleaning, Verifikasi Sensor Magnetic Switch No.2 Pay-off Reel Snubber Roll Close/Open Detect 2) PM Cleaning, Verifikasi Sensor Proximity No.2 Pay-off Reel Drum Shink / Expand Position Detect 3) PM Cleaning, Verifikasi Sensor Proximity No.2 Pay-off Reel - Hold Roll Open Detect- 0 Stroke Position- Center Stroke Position 4) Check and Verify Solenoid Valve Hydraulic POR 2 5) PM Cleaning No.2 Uncoiler Local Panel (LOP 2)
TglMulai
TglSelesai
TotalJam
Status
NamaPekerja1
NamaPekerja3
NamaPekerja2
NamaPekerja4
Comment :
PM cleaning Sensor sensor, Solenoid Valve Hydraulic POR 2 dan Tightening Local Panel (LOP 2) (DONE)