FM.MT.05.01
SURAT PERINTAH KERJA ( WORK ORDER )
WORKORDERNO
WORKCENTER
PRIORITY
TGLDIKERJAKAN
DURASIPEKERJAAN
EQUIPNO
JUMLAHORANG
EQUIPDESC
DESKRIPSI KERJA
Preventive Connection, Cleaning, Tightening Motor dan Fan - PU Roll, APP Roll dan Cleaning Hydraulic solenoid valve Finish Back Coater Check Connection, Tightening, Cleaning, Check Connection dan Cleaning Junction Box Finish Back Coater
MATERIAL
TOOLS
PROCEDURE :
Preventive Connection, Cleaning, Tightening Motor dan Fan - PU Roll, APP Roll Check Connection dan Cleaning Hydraulic solenoid valve Finish Back Coater Check Connection dan Cleaning Junction Box Finish Back Coater
TglMulai
TglSelesai
TotalJam
Status
NamaPekerja1
NamaPekerja3
NamaPekerja2
NamaPekerja4
Comment :
Done - Resistansi: App Roll Motor: U-V = 0,6 Ohm U-W = 0,6 Ohm V-W = 0,6 Ohm Fan: U-V = 113,4 Ohm U-W = 113,3 Ohm V-W = 113,6 Ohm PU Roll Motor: U-V = 0,6 Ohm U-W = 0,6 Ohm V-W = 0,6 Ohm Fan: U-V = 500.3 Ohm U-W = 500.6 Ohm V-W = 500.2 Ohm - Mohon koreksi durasi pekerjaan dan procedure (hanya ada 2 motor dan 2 selenoid double action) - Instruksi kerja diupdate