Toggle navigation
|
Inbox
View Profile
Log Out
FM.MT.05.01
SURAT PERINTAH KERJA ( WORK ORDER )
WORKORDERNO
WORKCENTER
PRIORITY
TGLDIKERJAKAN
DURASIPEKERJAAN
EQUIPNO
JUMLAHORANG
EQUIPDESC
DESKRIPSI KERJA
Preventive Connection, Cleaning, Tightening Motor dan Fan No.2 Bridle Roll 1# 2# Roll Motor
MATERIAL
TOOLS
PROCEDURE :
1 Preventive Connection, Cleaning, Tightening Motor dan Fan No.2 Bridle Roll 1# 2# Roll Motor 2 Check Connection Encoder sensor,No.2 Bridle Roll 1# &2# Roll Motor Speed feedback rev
TglMulai
TglSelesai
TotalJam
Status
NamaPekerja1
NamaPekerja3
NamaPekerja2
NamaPekerja4
Comment :
Preventive Connection, Cleaning, Tightening Motor dan Fan No.2 Bridle Roll 1# 2# Roll Motor (DONE) Roll 1 Resistansi Motor: U-V = 0,4 Ohm U-W = 0,4 Ohm V-W = 0,4 Ohm UVW-Grounding = oL Resistansi Fan: U-V = 0,62 KOhm U-W = 0,63 KOhm V-W = 0,62 KOhm UVW-Grounding = oL Roll 2 Resistansi Motor: U-V = 0,3 Ohm U-W = 0,3 Ohm V-W = 0,3 Ohm UVW-Grounding = oL Resistansi Fan: U-V = 0,63 KOhm U-W = 0,63 KOhm V-W = 0,64 KOhm UVW-Grounding = oL
Download
Back to List