Toggle navigation
|
Inbox
View Profile
Log Out
FM.MT.05.01
SURAT PERINTAH KERJA ( WORK ORDER )
WORKORDERNO
WORKCENTER
PRIORITY
TGLDIKERJAKAN
DURASIPEKERJAAN
EQUIPNO
JUMLAHORANG
EQUIPDESC
DESKRIPSI KERJA
1 Check, Cleaning, and Verify HSV Tension Reel Drum Spreading Spread 2 Check, Cleaning, and Verify HSV Tension Reel Drum Spreading Collapse 3 Check, Cleaning Tension Reel Drum Spreading position pressure 4 PM Cleaning, Verifikasi Sensor Proximity Tension Reel Lubrication Flow Indicator 5 Check Connection and Tightening Terminal Box Tension Reel 6 Check, Cleaning Tension Reel Lubrication Pressure Switch 7 PM cleaning Recoiler Local Panel LOP 20 8 PM Cleaning, Verifikasi Sensor Proximity switch LUB; Flow Normal, Filterblock, Preassure Switch, Manual Valve Open 9 PM Cleaning, Verifikasi Sensor Proximity switch Tension Reel hold down roll open position
MATERIAL
TOOLS
Majun, contact cleaner
hand tools ( 1 tas ) , multi meter , kunci shork mini , vacum cleaner
PROCEDURE :
Instruksi Pekerjaan 1. Gunakan PPE level 1 2. Pastikan Area Kerja Aman 3. Lakukan Isolation Procedure 4. Tanya Supervisor untuk kondisi darurat 5. Hubungi petugas medical bila ada sesuatu yang urgensi dan membutuhkan perawatan Instruksi Pekerjaan : PM Tension Reel Exit 1. Persiapkan dan pastikan material yang akan digunakan sudah lengkap 2. Persiapkan dan pastikan tools yang akan digunakan sudah aman dan lengkap 3. Lepaskan socket koneksi Encoder from module SMC30 to Motor Tension Reel Exit yang terletak di Panel 3A bagian depan 4. Matikan dan Isolasi Breaker untuk Fan Tension Reel Exit yang terletak di Panel 3A bagian belakang 5. Verifikasi tegangan output Breaker setelah di isolasi dan pastikan tegangan <1Volt 6. Matikan dan Isolasi Main Breaker No.1 Exit Hydraulic Pump dan No.2 Exit Hydraulic Pump yang terletak di Panel B07 7. Verifikasi dan Pastikan Exit Hydraulic Pump tidak healthy dengan cara ketika dioperasikan/Start No.1 Exit Hydraulic Pump dan No.2 Exit Hydraulic Pump di HMI exit Section, simbol Motor No.1 Exit Hydraulic Pump dan No.2 Exit Hydraulic Pump tetap berwarna merah/tidak berwarna hijau 8. Matikan dan Isolasi Breaker LUB pump Tension Reel Exit yang terletak di Panel B07 9. Verifikasi dan Pastikan LUB pump Tension Reel Exit tidak healthy dengan cara ketika dioperasikan/Start simbol Motor LUB pump Tension Reel Exit tetap berwarna merah/tidak berwarna hijau 10. Matikan dan Isolasi Disconnector Switch Tension Reel Exit yang terletak disamping Motor Tension Reel Exit 11. Lakukan Kegiatan : - Check, Cleaning, and Verify HSV Tension Reel Drum Spreading Spread, Collapse, position pressure - PM Cleaning, Verifikasi Sensor Proximity Tension Reel Lubrication Flow Indicator, - PM Cleaning, Verifikasi Sensor Proximity LUB Pump Flow Normal, Filterblock, Preassure Switch, Manual Valve Open - Cleaning & Tightening Terminal Box Tension Reel - PM cleaning Recoiler Local Panel LOP 20 - PM Cleaning, Verifikasi Sensor Proximity switch Tension Reel hold down roll open position 12. Jika sudah selesai, rapihkan kembali tools dan material yang digunakan. Pastikan tidak ada yang tertinggal. 13. Buka isolasi dan nyalakan kembali Disconnector Switch Tension Reel Exit 14. Buka isolasi dan nyalakan kembali No.1 Exit Hydraulic Pump, No.2 Exit Hydraulic Pump, dan Lubrication Pump Tension Reel Exit di Panel B07 15. Buka isolasi dan nyalakan kembali Breaker untuk Fan Tension Reel Exit di Panel 3A bagian belakang 16. Pasang kembali socket encoder ke module SMC30 di Panel 3A bagian depan Aspek Lingkungan : 1. Buang sampah dan Limbah B3 ke TPS
TglMulai
TglSelesai
TotalJam
Status
NamaPekerja1
NamaPekerja3
NamaPekerja2
NamaPekerja4
Comment :
Sensor Checking DONE
Download
Back to List