SURAT PERINTAH KERJA ( WORK ORDER )
WORKORDERNO
WORKCENTER
PRIORITY
TGLDIKERJAKAN
DURASIPEKERJAAN
EQUIPNO
JUMLAHORANG
EQUIPDESC
DESKRIPSI KERJA
Pemasangan Pipa untuk transfer chemical 1303 dari Bulky ke Tanki HWR#2
MATERIAL
TOOLS
Pipe 1"x1100mm (1), Elbow 1" 90 Deg Threaded (11), Camlock coupling tyoe F 1" (1), Selang spring 4 meter (1), Camlock coupling type C 1" (1), Pipe 1" SCH20x6000mm (3), Clamp omega pipe 1" (5), Pipe 1" SCH20x6000mm (1), Ball valve 1" (4), Water mur (2), Tee joint 1" (4), Hose nepel selang (2), Chemical hose with camlock x 1 meter (1), Pipe 1" x 1200mm (1), Elbow 1/2" 90 Deg Threaded (2), Ball Valve 1/2" (2), Push in 12 mm (4), Hose pneumatic 12mm (2), Pompa ARO 1" (11), Stirrer (1)
Gerinda Tangan (1), Travo las inverter (1), Faceshield visor (1), Kedok las (1), Sarung tangan las (1), Thread Machine (1)
PROCEDURE :
Instruksi Safety : 1. Gunakan PPE level 1 2. Pastikan area kerja aman dan lakukan prosedur isolasi di Panel E-Room 3. Tanya supervisor untuk kondisi darurat, panggil petugas medical untuk perawatan Aspek Lingkungan: 1. Buang sampah dan limbah B3 di TPS Instruksi Pekerjaan : 1. Potong pipa sesuai panjang yang dibutuhkan sesuai dengan gambar kerja 2. Snei pipa yang telah dipotong dengan mesin snei pipa 3. Assembly seluruh part yang sesuai dengan urutan bill of material di gambar 4. Lakukan tes kebocoran
TglMulai
TglSelesai
TotalJam
Status
NamaPekerja1
NamaPekerja3
NamaPekerja2
NamaPekerja4
Comment :
- tinggal trial