FM.MT.05.01
SURAT PERINTAH KERJA ( WORK ORDER )
WORKORDERNO
WORKCENTER
PRIORITY
TGLDIKERJAKAN
DURASIPEKERJAAN
EQUIPNO
JUMLAHORANG
EQUIPDESC
DESKRIPSI KERJA
Inject chlorine bak wtp A &B
MATERIAL
TOOLS
Chlorine cair 12% (1)
Obeng bunga (+)PH 1x75mm (1)
PROCEDURE :
Safety : Gunakan APD level 1 & sarung tangan chemical Environment: 1. Buang pail sisa inject ke B3 2. Apabila tumpah lap menggunakan absorbent chemical dan buang absorbent ke tempat sampah B3 Langkah kerja : 1. Gunakan APD 2. Siapkan cholorine cair 12 % 3. Buka tutup pail chlorin 4. Masukkan selang dossing pump ke dalam pail chlorine baru 5. Check apakah dossing pump hidup 6. Atur speed dossing pump 7. Buang sisa pail ke ruang B3.
TglMulai
TglSelesai
TotalJam
Status
NamaPekerja1
NamaPekerja3
NamaPekerja2
NamaPekerja4
Comment :
1 djeligen 25 liter