FM.MT.05.00
SURAT PERINTAH KERJA
WORKCENTER
PRIORITY
WORKORDERNO
TGLDIKERJAKAN
EQUIPNO
DURASIPEKERJAAN
EQUIPDESC
JUMLAHORANG
DeskripsiKerja
1 Check, Cleaning, and Verify HSV Tension Reel Drum Spreading Spread 2 Check, Cleaning, and Verify HSV Tension Reel Drum Spreading Collapse 3 Check, Cleaning Tension Reel Drum Spreading position pressure 4 PM Cleaning, Verifikasi Sensor Proximity Tension Reel Lubrication Flow Indicator 5 Check Connection and Tightening Terminal Box Tension Reel 6 Check, Cleaning Tension Reel Lubrication Pressure Switch 7 PM cleaning Recoiler Local Panel LOP 20 8 PM Cleaning, Verifikasi Sensor Proximity switch LUB; Flow Normal, Filterblock, Preassure Switch, Manual Valve Open 9 PM Cleaning, Verifikasi Sensor Proximity switch Tension Reel hold down roll open position
Material
Tools
Procedure
1 Check, Cleaning, and Verify HSV Tension Reel Drum Spreading Spread 2 Check, Cleaning, and Verify HSV Tension Reel Drum Spreading Collapse 3 Check, Cleaning Tension Reel Drum Spreading position pressure 4 PM Cleaning, Verifikasi Sensor Proximity Tension Reel Lubrication Flow Indicator 5 Check Connection and Tightening Terminal Box Tension Reel 6 Check, Cleaning Tension Reel Lubrication Pressure Switch 7 PM cleaning Recoiler Local Panel LOP 20 8 PM Cleaning, Verifikasi Sensor Proximity switch LUB; Flow Normal, Filterblock, Preassure Switch, Manual Valve Open 9 PM Cleaning, Verifikasi Sensor Proximity switch Tension Reel hold down roll open position
TglMulai
TglSelesai
TotalJam
Status
OPEN
OnProgress
Inspection
COMPLETED
NamaPekerja1
NamaPekerja3
NamaPekerja2
NamaPekerja4
Comment
Upload File
LINE CONDITION
Deskripsi
Tanggal Dibutuhkan